| A contractor should have access to all cleaning and inspection equipment necessary to prepare a host pipe for pipelining, suggested to include but not limited to: |
![]() | ||
![]() | ||
![]() | ![]() (with color pan and tilt camera) | |
| In order to properly install Ultraliner PVC Alloy Pipeliner, contractors generally need to acquire the following types of pipeliner installation equipment: |
![]() ![]() (Feel free to review the Ultraliner Field Service Crew boiler truck configuration) | |
![]() | |
![]() (to cool the air compressor air) | |
![]() | ![]() |
![]() [with gauges (high quality, liquid gauges are recommended) for monitoring temperature and pressure and with valves for controlling the volume of steam and air] | |
![]() | ![]() (hydraulic jacks shown as an example) |
![]() (to purge excess water from the steam line) | ![]() |
![]() | |
![]() (assortment of sizes capable of 4" to 24") | ![]() (for monitoring of plug pressures) |
![]() (to prepare the pipeliner for insertion pulling) | ![]() (to allow the winch cable to twist independently from the pipeliner during insertion) |
![]() | ![]() |
![]() (for preparing pipeliner for plugging) | |
![]() [with gauges (high quality, liquid gauges are recommended) for monitoring temperature and pressure and with a valve for adjusting pressure] | |
![]() | ![]() (for service lateral reinstatement) |
![]() (to meet local and national safety requirements, including but not limited to those pertaining to confined space entry -- a few items shown) | |
![]() (for trimming the pipeliner) | ![]() (for preparing the pipeliner for the insertion pull) |
![]() | ![]() (to assist with plug insertion) |
| Additionally, the availability of complimentary pipe rehabilitation techniques can be advantageous, such as: |
| Rev: 8/26/2004 |